Returning leased space to its original condition
At the end of a lease, when relocating or when giving back part of the leased area, the tenant must return the space to the condition it was received in, as set out in the lease and the building rules. The job is only finished when the building management or landlord inspects the space and signs it back. Anything missed or done wrong is deducted from the deposit.
TECO MSC regularly reinstates space in shopping malls and office buildings, including Vincom Le Van Viet, Vincom Bien Hoa, Vincom Pho Quang, Diamond Plaza and The Estella. We handle the whole job: survey, submissions to building management, strip-out, reinstatement of building and M&E works, haulage, through to the signed handover.
When space reinstatement is needed
- End of lease for an office, shop, training centre or showroom in a shopping mall or office building.
- Relocation: moving to new premises and handing back the old space.
- Giving back part of the area: reducing leased space to cut rent while the rest keeps operating.
Scope of reinstatement
| Item | What TECO MSC does |
|---|---|
| Fit-out and finishes | Remove partitions, counters, cabinets, wall-fixed furniture and signage |
| Ceilings | Remove feature ceilings; reinstate or replace ceiling tiles to the building’s ceiling system |
| Floors | Lift floor finishes (carpet, timber, tiles); break out screeds and re-level when the building requires a bare concrete floor |
| Walls | Patch drill and fixing holes; skim and repaint in the colour the building specifies |
| Air-conditioning | Return diffusers, ducts and indoor units to the building’s original layout |
| Power and data | Remove added systems; return power and lighting to the building’s connection points |
| Fire protection | Return detectors, sprinkler heads and exit lights to the original layout |
| Plumbing | Cap and reinstate added water and drainage points (pantries, private toilets) |
| Haulage | Remove debris via the goods lift within permitted hours; move reusable furniture and equipment to the client’s store or new premises |
How we work
- Survey and check: review the original handover record, the reinstatement clauses in the lease and the building’s fit-out rules; agree what must be reinstated, what may stay, and which furniture and equipment the client wants to reuse.
- Method statement and submissions: quantities, schedule, reinstatement drawings for air-con, power and fire protection; submit to building management, register workers, pay the works deposit.
- Night works: almost all strip-out, breaking and haulage is done outside the mall’s or building’s operating hours; areas are screened and cleaned after every shift.
- Inspection and handover: walk the space with the building management or landlord, fix any points raised and sign the handback record.
Programme and organisation
- Duration: about 21–30 days for 500 m², depending on the extent of reinstatement and the hours the building allows.
- Night works: malls and office buildings operate during the day, so noisy, dusty work and haulage are done at night.
- Large haulage volumes: debris, ceilings, floors and removed furniture are moved in loads scheduled around the goods lift, with vehicles in and out at the building’s set times.
- Partial handback while operating: screens separate the works area, and power and data for the remaining area are moved before the returned part is stripped out.
Handover sign-off and the deposit
Reinstatement is only complete when the building management or landlord signs the handback record. That is also the condition for the tenant to get the deposit back. TECO MSC settles two things from the start:
- Agree the list of items to reinstate with building management before any strip-out, rather than working on assumptions.
- Follow the building’s fit-out rules (hours, goods lift, dust, cleaning), because breaches are usually fined straight from the deposit.
Why TECO MSC
- Many reinstatements in shopping malls: familiar with the submissions, working hours, goods-lift schedules and inspections of the Vincom malls and office buildings.
- Interior fit-out is TECO’s core trade: we know which layers were added, how far to strip out and what base condition looks like.
- One contractor for building works, M&E and haulage: strip-out, ceilings, floors, air-con, power, fire protection and haulage under one party, responsible until the landlord signs off.
- Combined with your new office: if the new premises are being built at the same time, TECO designs and builds the office and moves reusable furniture across.
Selected projects
| Project | Area reinstated |
|---|---|
| Vincom Le Van Viet shopping mall, Ho Chi Minh City | 700 m² |
| Vincom Bien Hoa shopping mall, Dong Nai | 650 m² |
| Vincom Pho Quang shopping mall, Ho Chi Minh City | 600 m² |
| Diamond Plaza, Ho Chi Minh City | 200 m² |
| The Estella, Ho Chi Minh City – Apollo English centre (read the case) | 165 m² |
Service area: Ho Chi Minh City, Dong Nai, Tay Ninh, Can Tho.
Frequently asked questions
How long does space reinstatement take?
About 21–30 days for 500 m², mostly at night. Smaller areas take less.
What about furniture and equipment that can be reused?
TECO MSC dismantles them carefully and moves them to your store or new premises as requested.
What if the original handover record is missing?
TECO MSC works with building management to obtain the drawings and the building’s reinstatement requirements, and agrees the item list before work starts.
Must the floor go back to bare concrete?
It depends on the lease. Some buildings require finishes to be broken out; others let them stay if the next tenant takes them. Agree this in writing with building management.
Request a survey and quotation
TECO MSC surveys the space, checks the building’s reinstatement requirements and quotes in Ho Chi Minh City, Dong Nai, Tay Ninh and Can Tho. Hotline: +84 911 111 929 · Send a survey request